CURRENT
TRANFORMER METERING
Current transformers are used with instrument-rated meters, to meter
single-phase services greater than 400 amps (320 amps continuous), and
three-phase services greater than 200 amps. Smaller services use
direct-connect metering.
The customer provides and installs all
equipment beyond the point of delivery: meter sockets, cabinets and
enclosures for the meter and CTs, connection lugs, conduit, grounding,
protection equipment, and wiring from the load to the CT mounting base.
The power company provides and installs the meter, current transformers,
test switch, and local wiring associated with the meter, test switch,
and CTs.
Services Metered Using Current
Transformers
Services
metered using instrument-rated meters and current stransformers are shown
here.
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
|
|
|
 |
|
|
|
|
|
Single-Phase,
120/240V 3-Wire |
|
|
|
 |
|
|
|
 |
|
|
|
|
|
Three-Phase,
277/480V 4-Wire Wye | |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
|
 |
|
|
|
 |
|
|
|
|
|
Three-Phase,
120/208V 4-Wire Wye |
|
|
 |
|
|
|
 |
|
|
|
|
|
Three-Phase,
120/240V 4-Wire Delta |
| |
For
more information:
Current
Transformer Cabinet
Mounting Base for
CTs, Single-Phase Services
Mounting Base for
CTs, Three-Phase Services
Switchboard
Metering